Black nylon dog leash coiled on a white background, featuring a silver metal clasp

Smoochy Poochy 1" Nylon Training Long Dog Lead

15 feet
$35.00
Skip to product information
Black nylon dog leash coiled on a white background, featuring a silver metal clasp
1/2

Smoochy Poochy 1" Nylon Training Long Dog Lead

$35.00
In stock

Smoochy Poochy’s training leads (also called long lines), are available in classic black nylon webbing.  Width - 1".

The long lines give your dog freedom on their walks, helpful while training and are an effective way to practice recall.

NOTE: These leads are not designed to be used as a tie-out.

  • LEASH MATERIAL:  Durable nylon webbing.
  • CLEANING:  Hand wash or spot clean nylon leads with a gentle cleaning product.
  • CHEWING:  Nylon webbing is not chew proof.
  • COLOUR:  Colour swatches and colour pictures may vary on different screens.
  • DIMENSIONS:  Product dimensions may vary slightly.

You may also like